Quicklinks
Sign up for eBlast
Loop 337 lane switch to occur April 9 in front of NBHS
04/04/2019

Loop 337 Expansion Project - Lane Switch on April 9, 2019

On April 9, the new southbound lanes from River Road to State Highway 46 will open and cause traffic to shift. This stretch of Loop 337 includes the areas in front of New Braunfels High School and Oakwood Baptist Church all the way down to River Road.


Opening the new lanes will change the access to and from New Braunfels High School along Loop 337 (see diagram). Work will also begin on the existing lanes of Loop 337, with one northbound lane remaining open.


School Entrance

Northbound traffic will enter the high school as normal once they pass the football stadium. Southbound traffic will have a signalized intersection to make a left turn into the school entrance.


School Exit

Traffic will exit New Braunfels High School the same as it does currently, but from only one lane turning right. Motorists needing to travel southbound along Loop 337 will exit out the same exit and also make a right turn which will cause them to head northbound and use the new signalized U-turn near Oakwood Baptist Church to get onto the southbound lanes.


Signs have been placed to inform drivers of the change. Additional signage will be placed to help guide drivers.

 

For more information about the loop expansion project, visit www.TxDOT.gov or email hernan.rozemberg@txdot.gov.

 

CLICK TO DOWNLOAD MAP

 

CLICK TO VIEW TXDOT VIDEO REGARDING SWITCH (22 minutes in length)

We recommend forwarding to the following times to view information about the NBHS switch:

8:30 minute mark begins switch past River Road

11:00 minute mark starts talking about NBHS/Oakwood area

12:00 minute mark show new turnaround for southbound travelers

12:45 minute mark show new signalized entrance to NBHS


Copyright © 2019 - New Braunfels ISD

powered by ezTaskTitanium TM