NBISD Bond 2021

Proposed Projects

Proposition A - $321,300,000

List of Projects Cost
Ninth Grade Center Conversion to Long Creek High School $121,980,000
New Braunfels High School On-Site Campus Replacement (Phase 1 of 2) $102,772,000
Elementary School #11 in Veramendi Development $42,000,000
Carl Schurz Conversion to Student Academic Programs $5,045,000
Klein Road  / Voss Farms Elementary Classroom Additions $7,560,000
Playgrounds & Shade Structures $2,973,000
HVAC Upgrades $2,370,000
Buses & District Fleet* $2,000,000
Zipp Road Extension & Traffic Lights $4,600,000
Contingency / Inflation $30,000,000

*Short-term bond will be repaid in 10-year note.

 

Proposition B - $20,100,000

List of Projects Cost
Future Long Creek High School Varsity Competition Stadium $14,400,000
NBHS Pressbox $5,700,000

 

Proposition C - $6,600,000*

List of Projects Cost
Districtwide Technology $6,600,000

*Short-term bond will be repaid in 5-year note.

Total Bond Cost: $348,000,000


Election Day: November 2, 2021

  • Projected Cost: $121,980,000

     

    The school will become the district's 2nd high school - Long Creek High School. The campus will remain a Ninth Grade Center through the 2023-2024 school year. Once the conversion is complete, the school will have a student capacity of 2,200. The school was originally built in 2012 under the 2010 Bond with plans to become the district's 2nd high school.

     

    Projected Start Date: Spring 2023

     

    Projected Completion Date: Spring 2026

     

    Specifications:

     

    • Full academic wing with an Auditorium & Black Box Theatre
    • Career Technical Education Classrooms (Ag Sciences, STEM/Robotics, Health Sciences, Vet Med, Info Tech, Construction/Architecture, Multimedia/AV, Business, Culinary, Info Tech)
    • Athletic Facilities - Fields for Baseball & Softball, Field House, practice field, auxiliary gym & upgrades to competition gym
    • Additional Parking Lots

    CLICK HERE for downloadable file of images for LCHS

  • Projected Cost: $102,772,000

     

    The school will be rebuilt on-site. This bond will fund only Phase 1 of 2 for a full-campus replacement. The phases were developed from Option 3 of the NBHS Master Plan completed in JuneThe school was built in 1964 and added on to over the course of the past 55 years. NBHS is projected to be at capacity by 2024.

     

    Projected Start Date: Fall 2023

     

    Projected Completion Date: Fall 2025

     

    Specifications:

     

    • Classrooms and competition space for Athletics, Fine Arts & Visual Arts
    • Dining Areas, Commons & Kitchen
    • JROTC Facilities
    • Additional Parking & Green Space

    CLICK HERE for downloadable file of images for NBHS.

  • Projected Cost: $42,000,000

     

    This school will be built to address capacity issues at the elementary level. The plan is to provide relief for the Veramendi attendance zone and rezone the Lamar attendance zone.

     

    Projected Start Date: Summer 2024

     

    Projected Completion Date: Summer 2026

     

    Preliminary Specifications:

     

    • 2-story design
    • Kinder-5th grade

     

    The images provided here are conceptual and may not reflect the final design of the school.

    • New Elementary - Front of School Artist Concept

    • New Elementary - Back of School Artist Concept

    • New Elementary - Front of School Artist Concept

    CLICK HERE for downloadable file of images of the Elementary #11

  • Projected Cost: $7.5 million

     

    Funding to add additional classrooms at both Klein Road and Voss Farms Elementary Schools to relieve overcrowding and future growth in those attendance areas. Classrooms will be added to the end of each existing wing to increase the capacity of the school by at least 8 classrooms.

    • Elementary Rendering with classroom addition at End of Exitsing Wings

    • Rendering of Elementary with Portables instead of Permanent Classrooms

    • Aerial of Klein Road Elementary Showing Placement for Classroom Additions

    • Aerial of Voss Farms Elementary Showing Placement for Classroom Additions

    CLICK HERE for downloadable images of the proposed elementary school additions.
  • Projected Cost: $2.9 million

     

    The funding will include full playground replacements at 6 campuses and the installation of shade coverings at 9 campuses.

    • County Line (both)
    • Klein Road (both)
    • Lamar (both)
    • Lone Star ECC (both)
    • Memorial (both)
    • Walnut Springs (both)
    • Veramendi (shade coverings)
    • Voss Farms (shade coverings)
    • Elementary #11 (shade coverings when built)
    • Installation of shade coverings over playscapes

    • Playground equipment replacement & shade coverings